MAIN CONTRACTS (5/7)
|
|
|
BAR - MONTENEGRO (2011) (DUFERCO - ENEL S.p.A.)
Geological assessment of the area planned for the building of a thermoelectrical plant in Montenegro, near the town of Bar, as part of the feasibility study. Structural and geomorphological analysis. Integrated on- and off-shore multichannel seismic reflection survey for assessing the seismotectonic risks of the area. Geochemical characterization of soil and water. |
|
PIAN PALU' - (TN) ITALY (2010) (HYDRO-DOLOMITI S.p.A.)
Execution of very high resolution multichannel seismic reflection profiles in the alpine lake Pian Palù, an isolated area characterized by difficult access. Because of the environmental constrains, it was used a small zodiac specifically equipped for the survey which was then deployed in the lake by an helicopter. The seismic lines covered also the transition water-land. |
|
PETROLEUM SYSTEM EVOLUTION IN TORRENTE PARMA AND PANNOCCHIA PERMITS - (PR) ITALY (2010) (EDISON S.p.A.)
Integrated study of Geochemistry, Structural-Geology and Stratigraphy in the area of the permits Torrente Parma and Pannocchia, Northern Apennines: petroleum system evaluation and explorative implications. |
|
|
For further informations please contact us at: This email address is being protected from spambots. You need JavaScript enabled to view it. |